Sobha One Residences Construction Status: Your Complete May 2026 Update


Featured Image of Sobha One Residences Construction Status

Sobha One Residences is currently in the pre-construction mobilization stage after receiving full RERA approval on May 08 2026․ If you are weighing up an investment in One Residences at Sobha OneWorld in Hoskote‚ the most important question isn't how does it look? or what does it cost? — it is will it be delivered on time? At an average ticket size of 1 Crore plus and a construction window extending to September 2033‚ that question carries real weight․

This is the only construction status report on the internet built entirely from verified Karnataka RERA filings — not channel partner speculation․ Inside‚ you will find phase-wise RERA numbers‚ exact start and completion dates‚ tower heights‚ unit counts‚ and project costs — all pulled from the official KA-RERA portal as of 12 May 2026․

Project Snapshot: What is being built at Sobha OneWorld


This project is a premium high-rise development consisting of 3,484 luxury apartments across 14 massive wings․ For those looking for a quick overview‚ here is the essential data on the township:

Feature Project Details
Project Name One Residences at SOBHA OneWorld
Developer Sobha Limited
Location Old Madras Road‚ Hoskote‚ Bengaluru Rural 562114
Total Area 48․4 acres
Total Units 3‚484 across 14 Wings
Tower Heights 146․5 m (46 floors) and 149․55 m (47 floors)
Total Project Cost 4‚514․42 Crore
Master Plan Approval STRRPA/TP/CC/652/2025-26/318

Current Construction Status: Where the project stands today


The project has officially cleared the pre-launch legal phase and is ready for ground-breaking on June 01 2026․ Official Stage: New Project Launch — Post-RERA Approval‚ Pre-Construction Mobilization․ Where the project stands today:

  • RERA Status: All 6 phases received Karnataka RERA approval on 08 May 2026․
  • Planning Authority: Master plan approved by STRRPA on 07 May 2026 — a single integrated approval covering all 14 Wings․
  • Land Status: Land aggregation complete across multiple survey numbers in Amanidoddakere village․
  • Fund Security: 70 percent escrow protection now active for all buyer funds per RERA Section 4․
  • Filings: Forms 1‚ 2‚ and 3 (CA‚ Architect‚ and Engineer certified) have been filed for every phase․
  • Upcoming Milestone: First excavation begins 01 June 2026 (Phases 1 and 6)․
  • Full Mobilization: Final phase mobilization by 01 October 2026 (Phases 3 and 4)․

Verified RERA Numbers and Timelines for All Phases


Every phase of Sobha One Residences has a unique RERA registration to ensure buyer safety and transparency․ Every RERA number listed below is independently verifiable on the Karnataka RERA portal at rera․karnataka․gov․in․

Phase Wings RERA Registration Number Handover Date Cost
Phase 1 W1‚ W2 PRM/KA/RERA/1250/304/PR/080526/008634 31 Jul 2032 900․86 Cr
Phase 2 W3‚ W4 PRM/KA/RERA/1250/304/PR/080526/008637 30 Nov 2032 536․38 Cr
Phase 3 W5‚ W6 PRM/KA/RERA/1250/304/PR/080526/008635 30 Sep 2033 815․41 Cr
Phase 4 W7‚ W8 PRM/KA/RERA/1250/304/PR/080526/008636 30 Sep 2033 706․40 Cr
Phase 5 W9-W11 PRM/KA/RERA/1250/304/PR/080526/008638 28 Feb 2033 776․69 Cr
Phase 6 W12-W14 PRM/KA/RERA/1250/304/PR/080526/008639 31 Aug 2032 778․68 Cr

Handover Sequence: Who gets keys first


Phase 1 and Phase 6 are the first sections scheduled for delivery in the third quarter of 2032․ If early possession matters to you‚ Phase 1 Wings W1 and W2 is the fastest-delivered phase․ The delivery schedule is as follows:

  • Phase 1 (W1‚ W2): 31 July 2032 (73 months from start)
  • Phase 6 (W12-W14): 31 August 2032 (74 months)
  • Phase 2 (W3‚ W4): 30 November 2032 (75 months)
  • Phase 5 (W9-W11): 28 February 2033 (78 months)
  • Phases 3 and 4 (W5-W8): 30 September 2033 (83 months)

Tower Construction Specs: Engineering for high-rise living


The township features two distinct tower heights to provide panoramic views of the Whitefield skyline․ At 149․55 metres‚ the tallest Wings 47-floor towers place One Residences among the top 5 tallest residential towers in East Bengaluru․

  • Tallest Wings (149․55 m): Wings 01‚ 02‚ 09‚ 10‚ 11‚ 12‚ 13‚ 14 (47 floors)
  • Grand Wings (146․5 m): Wings 03‚ 04‚ 05‚ 06‚ 07‚ 08 (46 floors)
  • Parking Infrastructure: 3 basement levels for parking plus Ground plus 1st floor podium parking․
  • Total Parking: 3,484 covered parking bays (offering a dedicated unit-to-parking ratio)․

The Sobha Limited Track Record: Why delivery is guaranteed


Sobha Limited has a 30-year history of zero abandoned projects and has delivered over 148 million square feet of space․ Sobha is the only Indian real-estate company that owns its entire value chain — design‚ manufacturing steel‚ concrete‚ woodwork‚ glazing‚ and construction․

  • Experience: 148 million sq․ft․ delivered across 600 plus projects since 1995․
  • Reliability: Zero abandoned projects in 30 years․
  • Backward Integration: Sobha's precast facility at Attibele cuts construction time by 11 months versus traditional methods․
  • Quality Control: 1,456 quality checks per residential unit before handover․

Detailed Construction Schedule: Example of Phase 1


The construction is planned across three main stages beginning with deep excavation in June 2026․

  • Sub-Structure (June 2026 - Oct 2027): Earthwork‚ foundation footing‚ and 3 basement parking levels․
  • Super-Structure (Feb 2027 - April 2031): RCC framed structure‚ masonry‚ and plastering․
  • Finishing Works (Jan 2029 - July 2032): MEP finishing‚ painting‚ elevation work‚ and landscaping․

Construction Milestones: What to watch from 2026 to 2033


The construction follows a strict 7-year roadmap starting with excavation in mid-2026․

Timeline Expected Milestone
May 2026 RERA approval received all 6 phases
Jun-Oct 2026 Ground-breaking and all phases mobilization
2027 Foundation work and basement RCC structures
2028–2029 Structural superstructure rises across all phases
2030-2031 Internal finishing‚ MEP‚ and amenities completion
Q3 2032 First handovers for Phase 1 (W1‚ W2)
Sep 2033 Final handovers for the entire township

How to Track Progress as a Buyer


You can track live updates through the official Karnataka RERA portal by entering your specific phase registration number․ Search any of the 6 RERA numbers at rera․karnataka․gov․in․ Updates are legally required every quarter․

  • Official Portals: Check the Sobha official website or the dedicated buyer portal for quarterly progress photos․
  • Verification: Always cross-check claims against the official RERA portal․
  • Official Specs: The legally registered project is 48․4 acres‚ 14 Wings‚ and 3,484 units․

What the Timeline Means for Your Investment


This long-term construction window acts as a capital appreciation runway for investors․

  • For the End-User: You are looking at a 6–7 year handover horizon․ Plan family milestones and career stability accordingly․
  • For the Investor: This 6-year window is your capital-appreciation runway․ The neighborhood will transform with the STRR and Metro Blue Line while you wait․
  • For the NRI Buyer: RERA-backed escrow protection makes this purchase fundamentally safer․ Use NRE/NRO accounts and expect quarterly digital progress updates․

Direct Answers: Frequently Asked Questions


1. Is Sobha One Residences RERA approved

Yes. All 6 phases received Karnataka RERA approval on 08 May 2026 numbers 008634 through 008639.

2. When will construction begin

Excavation officially begins 01 June 2026 for Phases 1 and 6, followed by other phases in August and October 2026.

3. When will I get possession

Handover dates range from 31 July 2032 for Phase 1 up to 30 September 2033 for Phases 3 and 4.

4. How tall are the towers

The wings range from 46 to 47 floors, reaching heights of up to 149.55 metres.

5. How can I verify progress quarterly

Visit rera.karnataka.gov.in, enter your RERA number, and view live status updates uploaded by the developer every quarter.

6. What is the total project cost

The total estimated cost is 4,514.42 Crore, making it one of the largest residential investments in East Bengaluru.

Enquiry
Enquire Now